Two tracks. A buyer joins in one step: send a drawing and the quotation workflow starts, within 24 to 48 hours. A factory joins through qualification - document review, an audit, then sample validation - which takes about two to four weeks for the review and audit and six to fourteen weeks end to end when custom tooling is involved.
One question decides which process applies: are you buying parts, or making them? A buyer's entry step is a file transfer. A factory's entry step is evidence. Neither costs money, and neither is a formality, but the two timelines differ by an order of magnitude, so it is worth knowing which one you are on before a launch date is fixed.
If you are buying, joining means you are inside the quotation workflow, and nothing else changes: one project manager and one point of contact from the first enquiry through to the shipment. If you are making, joining means your records, your equipment and your output have been checked against a specification that a third party can audit, and the first order is deliberately small for exactly that reason.
What we do not do is charge for the door. There is no application fee, no listing fee and no subscription on either side, which is why the honest answer to how long it takes is about paperwork and sample parts rather than about money.
The buyer path is short because the checks happen on the part rather than on you.
Most of the delay in a first quotation is a missing file rather than a slow engineer. This is the short list, and each item changes a number that appears on the quote.
| Send this | Why it moves the price or the date |
|---|---|
| 3D model: STEP, IGES, X_T or STL | Cycle time, tooling route and DFM comments |
| 2D drawing with tolerances and finish callouts | Inspection plan, gauge choice and whether a process can hold it |
| Material and surface finish | Cost, lead time and whether a secondary supplier is needed |
| Annual volume and first-order quantity | Process choice: tooling-free work and tooled work cross over at different points |
| Target date and delivery destination | Production slot and freight mode |
| Compliance requirement, if any | Whether a specific grade, record set or third-party test applies |
| NDA or quality agreement, if you need one | Sign it before drawings are shared, not after |
For a factory, joining is a sequence of six gates, and each one asks for evidence rather than a promise.
The published numbers for custom parts are consistent. Qualification and quality-system review take about two to four weeks. The first-article and production-part approval stage adds two to six weeks after tooling is ready, which puts eight to fourteen weeks between first contact and an approved production part when a new die or mould has to be built. Measured on its own, an approval package takes three to four weeks to assemble for simple stamped or moulded parts, six to eight weeks for medium-complexity parts that need multi-stage processing and third-party testing, and ten to sixteen weeks for safety-critical parts.
| Stage | Typical duration | What makes it slip |
|---|---|---|
| Document review | 1 to 3 weeks | Gauge calibration or material certificates missing |
| On-site or remote audit | 1 day, plus scheduling | Checklist and scope not shared in advance |
| Corrective actions | 2 to 6 weeks | Findings in quarantine control or traceability |
| Sample and first article | 1 to 4 weeks | Drawing not frozen, or a change made mid-sample |
| Production release | 1 to 2 weeks | Approval level not agreed before samples ship |
The findings that delay a first approval are almost never about machining capability. They repeat, and they are administrative:
Two practical habits cut most of the delay. Send the checklist two weeks before the visit so the factory prepares the right evidence instead of guessing, and agree the approval submission level before tooling is released rather than after samples ship. Neither is expensive, and both remove the most common cause of a slipped date, which is surprise.
To start on either track, send what you already have. A buyer needs a model and a drawing. A factory needs a capability list, a licence and the process it wants to be considered for. From there the next step is a free design review on a live part or a scheduled audit, and both are quoted in weeks rather than in fees. See the partner programme for the factory side, CNC machining for the most commonly routed process and sheet metal fabrication for formed and welded work.
Scope and sources. Onboarding durations and the sequence of gates were compiled in 2026 from a published supplier onboarding timeline for stamping parts (qualification two to four weeks, approval two to six weeks after tooling, eight to fourteen weeks end to end, on-site audit mandatory above roughly USD 50,000) and from a PPAP cycle-time breakdown giving three to four weeks for simple stamped or moulded parts, six to eight weeks for medium complexity and ten to sixteen weeks for safety-critical parts. The recurring audit findings, the corrective-action window and the reported first-audit failure rate come from an automotive supply chain certification guide and from an overview of the six-stage automotive supplier admission process. These are planning ranges drawn from published experience, not commitments, and they move with the completeness of the documentation submitted. Nothing here states or implies that any factory holds a particular certificate; quality systems are confirmed per programme, per factory and in writing before production.